[{"data":1,"prerenderedAt":360},["ShallowReactive",2],{"navigation_docs_en":3,"-en-roadmap-methodologie":78,"-en-roadmap-methodologie-surround":355},[4,14,40,54,60,66,72],{"title":5,"path":6,"stem":7,"children":8},"The essentials","/en/proposition","en/1.proposition/1.index",[9,10],{"title":5,"path":6,"stem":7},{"title":11,"path":12,"stem":13},"Your need, understood","/en/proposition/comprehension","en/1.proposition/2.comprehension",{"title":15,"path":16,"stem":17,"children":18},"Overview","/en/architecture","en/2.architecture/1.index",[19,20,24,28,32,36],{"title":15,"path":16,"stem":17},{"title":21,"path":22,"stem":23},"Technical choices","/en/architecture/stack","en/2.architecture/2.stack",{"title":25,"path":26,"stem":27},"Security & compliance","/en/architecture/securite","en/2.architecture/3.securite",{"title":29,"path":30,"stem":31},"The modules","/en/architecture/modules","en/2.architecture/4.modules",{"title":33,"path":34,"stem":35},"Partner integration","/en/architecture/partenaires","en/2.architecture/5.partenaires",{"title":37,"path":38,"stem":39},"Information system","/en/architecture/systeme-information","en/2.architecture/6.systeme-information",{"title":41,"path":42,"stem":43,"children":44},"The plan","/en/roadmap","en/4.roadmap/1.index",[45,46,50],{"title":41,"path":42,"stem":43},{"title":47,"path":48,"stem":49},"The method","/en/roadmap/methodologie","en/4.roadmap/2.methodologie",{"title":51,"path":52,"stem":53},"The budget","/en/roadmap/budget","en/4.roadmap/3.budget",{"title":55,"path":56,"stem":57,"children":58},"Vortex-Soft","/en/equipe","en/5.equipe/1.index",[59],{"title":55,"path":56,"stem":57},{"title":61,"path":62,"stem":63,"children":64},"Specification","/en/cdc","en/6.cdc/1.index",[65],{"title":61,"path":62,"stem":63},{"title":67,"path":68,"stem":69,"children":70},"Infrastructure","/en/infrastructure","en/7.infrastructure/1.index",[71],{"title":67,"path":68,"stem":69},{"title":73,"path":74,"stem":75,"children":76},"Mockups","/en/maquette","en/8.maquette/1.index",[77],{"title":73,"path":74,"stem":75},{"id":79,"title":47,"badge":80,"body":81,"category":80,"description":348,"extension":349,"links":80,"meta":350,"navigation":352,"path":48,"seo":353,"stem":49,"tags":80,"__hash__":354},"docs_en/en/4.roadmap/2.methodologie.md",null,{"type":82,"value":83,"toc":338},"minimark",[84,93,98,101,105,112,115,124,198,201,208,211,279,285,292,295,310,313,317,320,327],[85,86,87,88,92],"p",{},"Four movements, and one rule that holds them all together: ",[89,90,91],"strong",{},"nothing is presented on slides."," What we demonstrate is software running, on your environment, with your test data.",[94,95,97],"h2",{"id":96},"the-four-movements","The four movements",[99,100],"amtm-method",{},[94,102,104],{"id":103},"monthly-increments-continuous-acceptance","Monthly increments, continuous acceptance",[85,106,107,108,111],{},"Every month ends with a working version deployed to ",[89,109,110],{},"your"," staging environment. Your teams work on it continuously from month 3, at a rate of two half-days per month.",[85,113,114],{},"You discover nothing at the end. If a direction does not suit you, the cost of correction is counted in days, not months.",[94,116,118],{"id":117},"three-environments",[119,120,123],"span",{"className":121},[122],"h2-soft","Three environments",[125,126,127,146],"table",{},[128,129,130],"thead",{},[131,132,133,137,140,143],"tr",{},[134,135,136],"th",{},"Environment",[134,138,139],{},"What it is for",[134,141,142],{},"Who has access",[134,144,145],{},"Opens",[147,148,149,166,182],"tbody",{},[131,150,151,157,160,163],{},[152,153,154],"td",{},[89,155,156],{},"Development",[152,158,159],{},"Our daily work",[152,161,162],{},"The team",[152,164,165],{},"M1",[131,167,168,173,176,179],{},[152,169,170],{},[89,171,172],{},"Staging",[152,174,175],{},"Your validation, fictitious or anonymised data",[152,177,178],{},"You and your teams, continuously",[152,180,181],{},"End of M2",[131,183,184,189,192,195],{},[152,185,186],{},[89,187,188],{},"Production",[152,190,191],{},"Your real operations",[152,193,194],{},"Your users",[152,196,197],{},"M5 for preparation, M6 for users",[85,199,200],{},"No real data passes through the development or staging environments.",[94,202,204],{"id":203},"what-counts-as-a-defect-and-what-does-not",[119,205,207],{"className":206},[122],"What counts as a defect, and what does not",[85,209,210],{},"This is the distinction that protects both parties. Without it, any new request can be presented as a defect, and any defect can be deflected as an enhancement.",[125,212,213,229],{},[128,214,215],{},[131,216,217,220,223,226],{},[134,218,219],{},"Level",[134,221,222],{},"Definition",[134,224,225],{},"Fix",[134,227,228],{},"Effect on the milestone",[147,230,231,247,263],{},[131,232,233,238,241,244],{},[152,234,235],{},[89,236,237],{},"Blocking",[152,239,240],{},"Makes an essential business process impossible with no workable workaround, or damages accounting integrity, or exposes data to an unauthorised person",[152,242,243],{},"Taken up within 4 working hours, fixed within 2 days",[152,245,246],{},"Suspends the milestone",[131,248,249,254,257,260],{},[152,250,251],{},[89,252,253],{},"Major",[152,255,256],{},"Severely degrades an essential process, but a documented workaround exists",[152,258,259],{},"5 working days",[152,261,262],{},"Does not block the milestone",[131,264,265,270,273,276],{},[152,266,267],{},[89,268,269],{},"Minor",[152,271,272],{},"Ergonomics, labels, presentation — no effect on the business result",[152,274,275],{},"Next release",[152,277,278],{},"None",[85,280,281,284],{},[89,282,283],{},"Not a defect",": functionality outside the frozen scope, a change of need after validation, a preference contrary to an approved mockup, behaviour compliant with the specification but judged unsuitable, a malfunction caused by a third-party service or by configuration made by your teams.",[94,286,288],{"id":287},"code-ownership",[119,289,291],{"className":290},[122],"Code ownership",[85,293,294],{},"Code is pushed continuously to a repository you own, from the first week. You see every contribution, every day.",[85,296,297,298,301,302,305,306,309],{},"The dossier distinguishes three regimes: the ",[89,299,300],{},"custom developments"," built for you — modules, screens, rules, workflows, charts of accounts, configuration — are assigned to you on full payment; Vortex-Soft's ",[89,303,304],{},"generic building blocks"," — frameworks, libraries, components, tooling — remain our property, with a perpetual and irrevocable licence for your operation, including by a third party of your choosing; ",[89,307,308],{},"open-source components"," remain governed by their licences, the list of which is delivered to you.",[85,311,312],{},"The system is designed to be taken over by another competent technical team, on the basis of the delivered documentation: architecture, database schema, installation, update and restore procedures.",[94,314,316],{"id":315},"opening","Opening",[85,318,319],{},"You are starting your business: there is no history to migrate, no double entry to eliminate, no accumulated discrepancies to explain. That is one workload less, and it is reflected in the price.",[85,321,322,323,326],{},"Only the ",[89,324,325],{},"opening reference data"," is entered — branches, users, networks, fee schedules, chart of accounts — and starting balances are recorded as dated, justified opening entries.",[85,328,329,330,333,334,337],{},"The first counter opens with ",[89,331,332],{},"on-site support on day one",". Any further counters open in waves. Before that, the production environment is prepared at month 5 and the ",[89,335,336],{},"timed restore drill"," is run: we destroy a copy and rebuild it from backups alone, with the ledger trial balance recalculated and compared. The real go-live is therefore not a first attempt.",{"title":339,"searchDepth":340,"depth":340,"links":341},"",2,[342,343,344,345,346,347],{"id":96,"depth":340,"text":97},{"id":103,"depth":340,"text":104},{"id":117,"depth":340,"text":123},{"id":203,"depth":340,"text":207},{"id":287,"depth":340,"text":291},{"id":315,"depth":340,"text":316},"One increment per month, one demonstration per milestone, acceptance testing that does not start at the end.","md",{"icon":351},"lucide:refresh-cw",true,{"title":47,"description":348},"ROYACXbxKeZ0kleu5D5wItQO3yi-oE1oHZNEYDBNVfk",[356,358],{"title":41,"path":42,"stem":43,"description":357,"children":-1},"Six months, three tracks, four milestones. Month 6 opens no new work.",{"title":51,"path":52,"stem":53,"description":359,"children":-1},"Nine million, six months, three people. Four instalments, of which only five million come from your working capital.",1787177558685]